A calculating method on optimal starting time of central air conditioners in building is proposed. First, the operation of air conditioners can be divided into two stages based on the historical energy consumption curve. Second, the second-stage energy consumption of air conditioner is analyzed, and a calculating method of optimal starting time is given based on TOU power price. Third, the method is tested and validated through onsite simulation, and the optimal starting time can be accurately calculated with this method. Finally, the relationship between energy saving and economy is studied, and the application scope of the method is presented. The test case shows that the method has significant economic and practical benefits to the enterprise without any transformation to air conditioner’s hardware and software.
李昌. 基于分时电价的办公建筑中央空调最优起动时间计算[J]. 电气技术, 2015, 16(8): 34-39.
Li Chang. The Calculating Method on Optimal Starting Time of Central Air Conditioners in Building based on TOU Power Price. Electrical Engineering, 2015, 16(8): 34-39.
[1] 辛洁晴, 吴亮. 商务楼中央空调周期性暂停分档控制策略[J]. 电力系统自动化, 2013, 37(5): 49-54.
[2] 张钦, 王锡凡, 别朝红, 等. 电力市场下直接负荷控制决策模型[J]. 电力系统自动化, 2010, 34(9): 23-28.
[3] 张钦, 王锡凡, 付敏, 等. 需求响应视角下的智能电网[J]. 电力系统自动化, 2009, 33(17): 49-55.
[4] 王蓓蓓, 李扬, 高赐威. 智能电网框架下的需求侧管理展望与思考[J]. 电力系统自动化, 2009, 33(20): 17-22.
[5] 张钦, 王锡凡, 王建学, 等. 电力市场下需求响应研究综述[J]. 电力系统自动化, 2008, 32(3): 97-106.
[6] Kurucz C N. A linear programming model for reducing system peak through customer load control programs[J]. IEEE Trans on Power Systems, 199611(4): 1817-1824.
[7] Chen J m. Scheduling of directload controlto minimizeload reduction for a utility suffering from Generation shortage[J]. IEEE Trans on Power Systems, 1993, 8(4): 1525-1530.
[8] Chen J m. Scheduling direct load control to minimize system operation cost[J]. IEEE Trans on Power Systems, 1995, 10(4): 1994-2001.
[9] 徐强, 庄智, 朱伟峰, 等. 上海市大型公共建筑能耗统计分析[C]. 城市发展研究——第7届国际绿色建筑与建筑节能大会论文集, 2011.
[10] 沈南飞. 需量控制在电力经济运行中的应用[J]. 电力需求侧管理, 2003(6): 41-43.