Abstract:The transmission line of a substation occur a 110kV single phase grounding fault which causes the action of the main transformer neutral point gap zero sequence protection and the cutting of main transformer operation. Through inspection of fault place and recorded fault data, the paper analyses the cause of the action of the main transformer protection caused by line fault, and gives some specific recommendations in order to ensure the safe operation of the system equipment.
张强, 吴绍武, 王德全. 一起线路故障引起主变中性点间隙击穿的原因分析[J]. 电气技术, 2016, 17(11): 153-156.
Zhang Qiang, Wu Shaowu, Wang Dequan. Cause Analysis of Transformer Neutral Point Gap Breakdown Caused by Line Fault. Electrical Engineering, 2016, 17(11): 153-156.