电气技术  2018, Vol. 19 Issue (12): 76-82    DOI:
研究与开发 |
基于PMU数据的300MW水电机组并网暂态分析
吴凡, 匡蕾
湖北清江水电开发有限责任公司,湖北 宜昌 443000
Transient analysis of 300MW hydro-power units grid-connected based on PMU data
Wu Fan, Kuang Lei
Hubei Qingjiang Hydropower Development Co., Ltd, Yichang, Hubei 443000