Analysis of velocity field of high-speed railway transmission line based on Fluent
Zhang Yuchan1, He Zhenghao2
1.China-EU Institute for Clean and Renewable Energy, Huazhong University of Science and Technology,Wuhan 430074; 2.School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074
Abstract:With the advantages of convenience and comfort, the high-speed railway has developed rapidly in recent years. A large number of on-site observations have revealed that when the high-speed rail passes under the transmission line, significant vibration will occur on the line, which will aggravate the fatigue damage of the line, resulting in a decrease in the mechanical characteristics of the line and causing a dropped line accident. However, there is no research on the influence of train wind on line vibration at home and abroad. The design of the line does not consider the fatigue damage induced by such vibration and the safety reduction. Based on Fluent finite element analysis software, this study uses Fluent finite element analysis software to numerically simulate the velocity field generated by the high-speed rail around the transmission line. After processing and analysis, it is found that the wind speed direction of the train around the line is alternately changing, and the train wind is predicted. It will aggravate the line fatigue damage. It is recommended to have a ground distance of not less than 9m across the high-speed rail line.
张玉婵, 何正浩. 基于Fluent分析交叉跨越输电线路流场分布[J]. 电气技术, 2019, 20(5): 5-9.
Zhang Yuchan, He Zhenghao. Analysis of velocity field of high-speed railway transmission line based on Fluent. Electrical Engineering, 2019, 20(5): 5-9.
[1] 李人宪, 赵晶, 张曙, 等. 高速列车风对附近人体的气动作用影响[J]. 中国铁道科学, 2007(5): 98-104. [2] 张小钢, 刘应清, 赵海恒. 高速列车经过路边建筑物时的非定常湍流绕流数值模拟研究[J]. 铁道学报, 1998(2): 87. [3] 周志勇, 程波, 艾辉林. 高速列车过站空气动力学效应数值模拟研究[J]. 力学季刊, 2010, 31(4): 521-527. [4] 雷波, 刘应清. 高速列车作用在跨线天桥上风压力的数值模拟[J]. 西南交通大学学报, 1999, 34(3): 259-263. [5] 杨亦军, 王庆云, 林志兴. 高速列车通过时跨线钢板梁桥的风致振动及其对策研究[J]. 世界桥梁, 2005(1): 46-49. [6] 张帅. 高铁客站邻线结构列车风致振动响应研究[D]. 北京: 北京交通大学, 2016. [7] Zhigang Liu, Yang Song, Ye Han, et al.Advances of research on high-speed railway catenary[J]. Journal of Modern Transportation, 2018, 26(1): 1-23. [8] Carnicero A, Lopez-Garcia O.An algorithm based on finite element method and catenary equation to compute the initial equilibrium of railway over- head[C]//8th International Conference on Com- putational Structures Technology, Spain, 2006: 12-15. [9] Jimenez-octavio J R, Carnicero A Cristina S R, et al. A moving mesh method to deal with cable structures subjected to moving loads and its application to the catenary pantograph dynamic interaction[J]. Journal of Sound and Vibration, 2015, 349: 216-229. [10] Yamashita Y, Ikeda M.Advanced active control of contact force between pantograph and catenary for high-Speed trains[J]. Quarterly Report of RTRI, 2012, 53(1): 28-33. [11] Ikeda M, Nagasaka S.Aprecise contact force measuring method for overhead catenary system[C]// Proc.of the 5th World Congress on Railway Research Proceeding, 2001: 1-12. [12] Usuda T, Ikeda M.Method for detecting step-shaped wear on contact strips by measuring catenary vibration[J]. Quarterly Report of RTRI, 2011, 52(4): 237-243. [13] Alberto A, Benet J, Arias E, et al.A high performance tool for the simulation of the dynamic pantograph- catenary interaction[J]. Mathematics and Computers in Simulation, 2008, 79(3): 652-667. [14] Benet J, Cuartero N, et al.An advanced 3D-model for the study and simulation of the pantograph catenary system[J]. Transportation Research Part C: Emerging Technologies, 2013, 36: 138-156. [15] 王圣昆. 大风区接触网状态分析及在线监测研究[D]. 北京: 北京交通大学, 2018. [16] Stickland M T, Scanlon T J.An investigation into the mechanical damping characteristics of catenary contact wires in a cross-wind[J]. Proceeding of the Institution of Mechanical Engineers Part F Journal of Rail&Rapid Transit, 2001, 215(4): 311-318. [17] Pombo J, Ambrosio J, Pereira M, et al.Influence of the aerodynamic forces on the pantograph-catenary system for high-speed trains[J]. Vehicle System Dynamics, 2009, 47(11): 1327-1347. [18] Pombo J, Ambrósio J.Environmental and track perturbations on multiple pantograph interaction with catenaries in high-speed trains[J]. Computers and Structures, 2013. [19] 刘航宇, 刘念, 蒲丽娟, 等. 基于Fluent的高压大截面电缆金具短路电动力和机械应力分析[J]. 电工技术学报, 2016, 31(5): 170-176. [20] 袁海燕, 傅正财. 基于有限元法的±800kV特高压直流输电线路离子流场计算[J]. 电工技术学报, 2010, 25(2): 139-146. [21] 孙帅, 卢铁兵, 崔翔. 交直流导线平行架设时混合电场特性分析[J]. 电工技术学报, 2017, 32(8): 138-143. [22] 宋福根, 林韩, 兰生. 特高压输电线路交叉跨越区域工频电场分布计算[J]. 电气技术, 2016, 17(1): 6-10. [23] 林育艺, 林燕鸿. 输电线路电场计算的非连续网格有限元法[J]. 电气技术, 2017, 18(4): 71-74. [24] 徐哓菊. 对不可压缩流体连续性方程的讨论[J]. 科技创新导报, 2007(28): 37. [25] 陈清伟, 邱望标. 基于Fluent的集肤效应分析[J]. 贵州科学, 2012, 30(1): 58-62.