电气技术  2021, Vol. 22 Issue (2): 72-77    DOI:
技术与应用 |
地线融冰自动接线装置合闸操作远控方案的研究
徐望圣1, 曹伟伟2, 谭劲1, 陆桂来2, 颜艳1
1.中国南方电网有限责任公司超高压输电公司贵阳局,贵阳 550081;
2.南京电力金具设计研究院有限公司,南京 211500
Research on remote control transformation scheme for closing operation of ground wire ice-melting automatic wiring device
XU Wangsheng1, CAO Weiwei2, TAN Jin1, LU Guilai2, YAN Yan1
1. China Southern Power Grid EHV Transmission Company Guiyang Bureau, Guiyang 550081;
2. Nanjing Power Fitting Design & Research Institute Co., Ltd, Nanjing 211500