电气技术  2013, Vol. 14 Issue (12): 83-85    DOI:
技术与应用 |
优化变电站新型设备二次回路验收的步骤
刘俊才
内蒙古鄂尔多斯市薛家湾镇薛家湾供电局, 内蒙古鄂尔多斯010300
Optimization the Steps of the Transformer Substation Two Loop Check before Acceptance
Liu Juncai
The Xuejiawan town of Erdos City in Inner Mongolia, Xuejiawan Power Supply Bureau,
Eerduosi, Inner Mongolia 010300