Abstract:with the development of smart grid,the information of timing device in the substation Need to build data model complying with IEC61850,in order to satisfy the requirement of mutual connection and mutual through.Based on the analysis of timing device’s communication interface and its data requirement,the TSSM logic node that expanding the timing device’s self checking information is is presented. TSSM logic node is built and mapping to data transfer protocol manufacturing message specification (MMS).The equipment that meets the requirements of IEC61850 is operating in the field.
李大鹏. 基于IEC61850的对时装置建模[J]. 电气技术, 2014, 15(03): 91-94.
Li Dapeng. The IEC61850 Modeling of A Timing Device. Electrical Engineering, 2014, 15(03): 91-94.
[1] 张清枝,坐群业,何刚,等.智能变电站网络对时测试研究[J].电力系统保护与控制,2010(21). [2] 韩本帅,孙中尉,崔海鹏,等.智能变电站过程层时间同步方式研究[J].中国电力,2010,45(11). [3] 高磊,袁宇波,宋亮亮.能变电站监控系统时间体系研究[J].电力自动化设备,2012(3). [4] 余晓鹏,李琼林,等.基于IEC61850的电能质量监测终端数据分析及模型实现[J].电力系统自动化,2011,35(4):56-60. [5] 国家电网公司.Q/GDW 396-2009.IEC61850 工程继电保护应用模型. [6] IEC.Communication networks and systems for power utility automation :Part 6 configuration description language for communication in electrical substations related to IEDs[S].2009. [7] IEC,Communication networks and systems for power utility automation:Part 7-2 basic communication structure for substation and feeder equipment-Abstract communication service interface(ACSI).2003. [8] IEC,Communication networks and systems for power utility automation:Part 7-4 basic communication structure-compatible logical node classes and data object classes [S].2010. [9] IEC,Communication networks and systems for power utility automation:Part 8-1. Specific Communication Service Mapping(SCSM)-Mappings to MMS(ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 2004.