110kV Xinye Substation Two Main Transformer of Run in Parallel with Feasibility Analysis |
Zhao Yingbo |
Xinye Electricity bureau, Xinye, Henan 473500 |
|
|
Abstract This article through 110kV Xin-ye substation two main transformer of run in parallel with feasibility analysis. And testified run parallel with two transformers is feasible. And according to the actual operation of transformer when run in parallel with the circulations is analyzed, and prove the above two transformer is tied for the operation reliability and connecting with the reality of transformer transformation problems of suggestions.
|
Received: 26 June 2014
Published: 26 June 2014
|
|
|
|
Cite this article: |
Zhao Yingbo. 110kV Xinye Substation Two Main Transformer of Run in Parallel with Feasibility Analysis[J]. Electrical Engineering, 2013, 14(01): 84-84.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2013/V14/I01/84
|
|
|
|