Implementation of the IT System in the Subsatation Grounding System of Off Shore Platform |
Xu Zhongshu |
Schneider Electric (China) Co., Ltd, Beijing 100102 |
|
|
Abstract This document analyze the substation grounding system of offshore platform which may be normal operation and abnormal operation. The insulation monitoring system solution, including simple systems, stand-alone systems and integrated systems, can effectively ensure a continuous supply of the system and supply reliability.
|
Published: 28 March 2013
|
|
|
|
Cite this article: |
Xu Zhongshu. Implementation of the IT System in the Subsatation Grounding System of Off Shore Platform[J]. Electrical Engineering, 2013, 14(03): 53-57.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2013/V14/I03/53
|
[1] Schneider Electric.电气装置应用(设计)指南(第2版).北京:中国电力出版社,2008. [2] 中国航空规划设计研究院组编.工业与民用配电设计手册[M].北京:中国电力出版社,2005. [3] Schneider Electric.绝缘监测装置Vigilohm.2001.1. [4] 《海洋石油工程设计指南》编委会.海洋石油工程电气、仪控、通信设计[M].北京:石油工业出版社,2007. [5] 中国建筑学会建筑电气分会.民用建筑电气设计规范实施指南[M].北京:中国电力出版社,2008. [6] [印度]谢尔德拉克(Shel-drake,A.L.)..电气工程手册[M].孙洪程,马昕,王同浩,译.北京:化学工业出版社,2006. [7] 中国船级社.海上固定平台入级与建造规范[M].北京:人民交通出版社,1992. [8] 中国船级社.海上移动平台入级与建造规范[M].北京:人民交通出版社,2005. |
|
|
|