School of Electrical and Information Engineering of Xihua University, Chengdu 610039 |
|
|
Abstract Set up the mathematical model of Dynamic reactive power optimization. Then make an improvement of the basic genetic algorithm , And using IEEE30 node system are verified against it. Using the improved algorithm to get the control equipment action schedule in the case of Introducing the load factor. The simulation results show that this method can improve the voltage qualification rate, allocate the action equipment action time reasonably, to be able to meet the requirements of Real-time network optimization.
|
Published: 04 November 2014
|
|
|
|
[1] 张勤,套筒窑的自动化控制研究[J].节能,2010(10). [2] 赵庆.贝肯巴赫套筒窑的三电系统简介及改进[J].冶金自动化,2009(S1). [3] 陆正明. 贝肯巴赫环形套筒窑窑衬技术发展进程[J].工业炉,2012(5). [4] 陆正明,卢金赉. 贝肯巴赫环形套筒窑窑衬结构技术发展状况[J].梅山科技,2011(3). |
|
|
|