Research on Dynamic Reconfiguration of Active Distribution Network |
Gong Xiaoxin1, Shu Bin2, Wu Zhensheng3 |
1. State Grid Beijing Electric Power Company, Beijing 100031; 2. Beijing Power Economic Research Institute, Beijing 100055; 3. CP High Technology Technology, Beijing 100044 |
|
|
Abstract The reconfiguration of active power distribution network are realized through the switch on and off. The operation condition of the power system changes according to the load of the system. The distribution network reconfiguration is determined by the current operational status. Every section of power flow time includes an optimal topology of distribution network. Considering the best of the network loss, distribution network requires to reconfigure in all the time. The reconfiguration needs to change the switch status. Frequent switch’s operation causes the probability of failure increasing and makes the life of the switchgear decreasing. This is the reason why we find a balance between network loss and switching costs. This paper takes 24 hours as an example and every hour is one time interval. Each node’s load of each time is a fixed value. Three network topology that network loss is less in each period constitute a relatively optimal solution set. Two topology that between the consecutive period structure require to match. Not only match the switchs whom changes is less, but match in one pair. It has three chains connection between two consecutive times, and the chain will be formed by 24 time intervals. The final calculation of network loss, minimizing the sum of expenses and expenses of switch operation for selecting dynamic reconfiguration scheme.
|
Published: 22 December 2014
|
|
|
|
Cite this article: |
Gong Xiaoxin,Shu Bin,Wu Zhensheng. Research on Dynamic Reconfiguration of Active Distribution Network[J]. Electrical Engineering, 2014, 15(12): 52-55.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2014/V15/I12/52
|
[1] Baran M E, Wu F F. Network reconfiguration in distribution systems for loss reduction and load balancing[J]. IEEE Trans. on PWRD, 1989, 4(2): 1401-1407. [2] 毕鹏翔, 刘健, 张文元. 配网重构的改进支路交换法[J]. 中国电机工程学报, 2001, 21(8): 98-103. [3] Shirmohammadi D, Hong H W. Reconfiguration of electric distribution networks for resistive line loss reduction[J]. IEEE Trans on PWRD, 1989, 4(2): 1492- 1498. [4] Kashem M A, Jasmon G B, Mohamed A, et al. Artificial neural network approach to network recon- figuration for loss minimization in distribution net- works[J]. Electrical Power & Energy Systems, 1998, 20(4): 247-258. [5] Chiang Hsiao Dong, Jumean Rene Jean. Optimal network recon figurations in distribution systems[J]. IEEE Trans. on PWRD, 1990, 5(3): 1568-1574. [6] Nara K, et al. Implementation of genetic algorithm for distribution systems loss minimum reconfiguration[J]. IEEE Trans. on PWRS, 1992, 7(3): 1044-1051. [7] Son YH, et al. Distribution network reconfiguration for loss reduction using fuzzy controlled evolutionary programming[J]. IEE Proc Gener. Trans. on Distrib, 1997, 144(4): 345-350. [8] 刘莉, 陈学允. 基于模糊遗传算法的配电网络重构[J]. 中国电机工程学报, 2000, 20(2): 66-69 [9] Koichi Nara Atsushi Shiose, Minoru Kitagawa. Imple- mentation of Genetic Algorithm for Distribution Systems Loss Minimum Reconfiguration[J]. IEEE Trans. on PWRS, 1992, 7(3): 1044-1051. [10] 毕鹏翔, 刘健, 刘春新, 等. 配电网络重构的改进遗传算法[J]. 电力系统自动化, 2002, 26(2): 57-61. [11] 李振坤, 陈星莺, 余昆. 电网重构的混合粒子群算法[J]. 中国电机工程学报, 2008, 28(31): 35-41. [12] 李振坤, 陈星莺, 赵波, 等. 配电网动态重构的多代理协调优化方法[M]. 中国电机工程学报, 2008, 28(34): 72-79. [13] 邓佑满, 张伯明, 田田. 虚拟负荷法及其在配电网络动态优化中的应用[J]. 中国电机工程学报, 1996, 16(4): 241-244. [14] 尹丽燕, 于继来. 多时段落的配电网络动态重构[[J]. 中国电机工程学报, 2002, 22(7): 44-48. [15] 吴建中, 余贻鑫. 最小化运行费用的时变重构全局优化算法[J]. 中国电机工程学报, 2003, 23(11): 13-17. [16] 方兴, 郭志忠, 蔡中勤. 基于时间周期的配电网络动态重构[J]. 电力自动化设备, 2004, 24(5): 31-34. [17] 刘蔚, 韩祯祥. 基于时间区间的配电网重构[J]. 电力系统自动化, 2006, 30(10): 33-38. [18] The IEEE reliability test system-1996. IEEE Trans on Power System, 1999, 14(3): 1010-1020. |
|
|
|