Electrical Primary Research and Design of 35 kV Substation |
Yuan Lijuan |
Sichuan Liangshan Power Supply Company, Liangshan, Sichuan 615000 |
|
|
Abstract Based on national standard about the design of 35kV substation, manuals, standards and the subject for 35kV terminal step-down transformer substation electrical primary research and design. 35kV bus side with single busbar connection and take a way back into the line, the main transformer adopts two SZ9-8000/35 on-load voltage regulating transformer; 10kV side with simple single busbar of busbar and eight back line; 10kV main feed line the ZN28-12 type vacuum circuit breaker, wire controller circuit breaker and protection, is employed as control and protection, this topic research combined with the requirements of the new era, and adopt new technologies and energy-saving design principles, to further improve the substation electrical system optimization design, have certain reference significance to facilitate the future substation project design, improve the work efficiency.
|
Published: 20 July 2015
|
|
|
|
[1] 韩国政. 基于间隔的电力网络拓扑分析[D]. 济南: 山东大学, 2006. [2] 高波. 关于10kV变电所二次回路设计的探讨[J]. 价值工程, 2010, 29(33): 288-289. [3] 袁文进. 电气主接线各种连接方式优缺点与实际应用[J]. 现代商贸工业, 2007, 19(3): 192-193. [4] 刘少文, 张金贵. 变电所电气主接线与变压器选择分析[J]. 黑龙江科技信息, 2010(4): 4, 245. [5] 李斌. 浅谈建筑文化的地域特色[J]. 城市建设与商业网点, 2009(10): 104-107. [6] 王希舟. 分布式发电与配电网保护协调性研究[D]. 杭州: 浙江大学, 2006. [7] 赵雪菲. 110kV变电站设计[D]. 河北: 华北电力大学, 2012. [8] 施荣卫. 变电站自动化系统的设计及应用[D]. 西安: 西安石油大学, 2008. [9] 荣莉. 计算机监控系统在变电所典型设计中的应用[J]. 电气应用, 2007, 26(4): 158-161. [10] Hong S Y, Wang Q. A wavelet-based method to discriminate between inrush current and internal fault, IEEE International Conference on Power System Technology, Perth, Australia: IEEE/PES[Z]. 2000: 927-931. |
|
|
|