Monitoring and Correction Strategy of GIL'S Vertical Deformation in Operation of Nuclear Power Plant |
Song Xiaobin1, Chen Jianqing2, Li Tianhua3, Chen Jun4 |
1. China Nuclear Power Engineering Co., Ltd, Shenzhen, Guangdong 518124; 2. Sinohydro Bureau 16 Co., Ltd, Fuzhou 350003; 3. Guangdong Topkey Power Technical Development Co., Ltd, Guangzhou 510530; 4. Chen Du Haiguang Nuclear Technology Service Co., Ltd, Chengdu 610000 |
|
|
Abstract Aiming at the GIL’s vertical deformation increase problem in operation of nuclear power plant. In this paper, the vertical deformation process of the GIL in nuclear power plant is introduced, and the causes of the vertical deformation of the GIL are analyzed, and the corresponding monitoring and correcting strategies are given.
|
Published: 23 May 2017
|
|
|
|
Cite this article: |
Song Xiaobin,Chen Jianqing,Li Tianhua等. Monitoring and Correction Strategy of GIL'S Vertical Deformation in Operation of Nuclear Power Plant[J]. Electrical Engineering, 2017, 18(5): 82-86.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2017/V18/I5/82
|
[1] DL/T 978—2005. 气体绝缘金属封闭输电线路技术条件[S]. [2] GB/T 22383—2008. 额定电压72.5kV及以上刚性气体绝缘输电线路[S]. [3] 尚涛, 李果. 气体绝缘输电线路的特点及其应用[J]. 南方电网技术, 2011, 5(1): 81-84. [4] GB 50149—2010. 电气装置安装工程母线装置施工及验收规范[S]. |
|
|
|