Measurements for Improving Weight on Both Sides of Perch’s Ice Thickness of the Wire |
Dong Dejie |
Liaoning Vocation College Golf Institute, Tieling, Liaoning 112099 |
|
|
Abstract When the span between the two straight towers is two long, it will tremendously affect the weighing measurement accuracy of the transmission line ice thickness. Based on the traditional weighing method to calculate the ice thickness of the conductor, to measure the difference of transmission line length before and after ice loading, as well as the inclining angle of both sides of the main tower, then builds new mechanical model to solve the ice weight on transmission lines on both sides of the main tower. Finally, it’s able to calculate the thickness of ice loading. It can avoid calculation error is too big by the span between the two straight towers is two long. Through constructing analog transmission lines and multiple sets of experiments, validate the improved accuracy of the weighing method is relatively high.
|
Published: 20 April 2015
|
|
|
|
[1] 蒋兴良, 易辉. 输电线路覆冰及防护[M]. 北京: 中国电力出版社, 2002. [2] 黄新波, 李佳杰, 欧阳丽莎, 等. 采用模糊逻辑理论的覆冰厚度预测模型[J]. 高电压技术, 2011, 37(5): 1245-1252. [3] 蒋兴良, 常恒, 胡琴, 等. 输电线路综合荷载等值覆冰厚度预测与试验研究[J]. 中国电机工程学报, 2013, 33(10): 177-183, 前插23. [4] 胡毅. 电网大面积冰灾分析及对策探讨[J]. 高电压技术, 2008, 34(2): 215-219. [5] 陈金熠, 范春菊, 胡天强, 等. 考虑架空输电线路状态的线路覆冰监测系统的研究[J]. 电力系统保护与控制, 2012, 40(15): 93-98. (下转第60页) |
|
|
|