Jiangmen Substation Retrofit Scheme is Studied |
Huang Jinming |
Guangdong Power Grid Co., Ltd., Jiangmen Power Supply Bureau, Jiangmen, Guangdong 529000 |
|
|
Abstract With commissioning of Nuozhadu DC project, Yangjiang nuclear power station and increase in outgoing line of 500kV jiangmen substation, GIS equipment of jiangmen substation will not be able to match bus crossing power and short circuit current of the system. To solve the problem, this paper analyses difficulty、effect and impact on the system of several possible measures. Then, jiangmen substation reconstruction is suggested. Comparing technicality, economy of two possible scheme and calculating short circuit current,the recommendatory scheme is jiangmen substation reconstruction in original area: 500kV distribution device is modified to HGIS.
|
Published: 20 April 2015
|
|
|
|
[1] 钟杰峰, 陈旭, 吴宝英, 等. 广东500kV主网可靠性评估[J]. 华东电力, 2004, 32(3): 19-22. [2] 钟杰峰, 曹华珍, 曾勇刚, 等. 近期广东电网分区供电方案研究[J]. 华东电力, 2004, 32(9): 57-59. [3] 邱伟, 钟杰峰, 李峰, 等. 糯扎渡特高压直流规模对广东电网影响研究[J]. 南方电网技术, 2009, 3(6): 18-21. [4] 毛晓明, 吴小辰. 南方交直流并联电网运行问题分析[J]. 电网技术, 2004, 28(2): 6-9, 13. [5] 蔡广林, 曹华珍. 广东电网限制短路电流措施探讨[J]. 南方电网技术, 2011, 5(1): 90-94. [6] 杨振纲, 李力, 李扬絮, 等. 广东电网短路电流超标问题及对策[J]. 南方电网技术, 2011, 5(5): 90-93. (下转第96页) |
|
|
|