Configuration Analysis of Generator Circuit Breaker for Large Generator |
Zhou Daojun |
Shenhua Guohua Taicang Power Generation Co., Ltd, Taicang, Jiangsu 215433 |
|
|
Abstract Since the factory after the separation of grid and power plant startup/standby power if the neighboring substation connection, in addition to responsible for power plant transmission line infrastructure investment, but also to the Power Grid Corp long-term operation after the payment of basic electricity transformer expensive, therefore, the design institute and the power plant on the new project repeated design scheme optimization, and strive to improve the generating units put into operation after the bidding capacity. This article from the comparison and analysis of several economic, technology and safety, to GCB or not discussed comprehensively, some opinions starting motor circuit breaker is arranged, which can provide reference for the construction of whole life cycle of the biggest benefits of efficient power plant.
|
Published: 26 February 2016
|
|
|
|
[1] 刘洋, 李霞. 600MW级机组起动/备用电源引接方式优化[J]. 能源与环境, 2007(5): 50-52, 56. [2] DL/T 5000—2000. 火力发电厂设计技术规程[S]. 北京:中国电力出版社, 2000: 64. [3] 沈文兰, 李本, 李建国. 研制国产发电机断路器的主攻方向[C]. 中国水力发电工程学会2010年电气学术交流会. 2010. [4] 徐齐巍. 大容量SF 6 发电机断路器关键技术的探讨[J]. 智能电网, 2015(3): 201-207. [5] DL/T 1073—2007. 电厂厂用电源快速切换装置通用技术条件[S]. [6] 徐新平. 大机组GCB方式下并网特点及分析[J]. 中国动力工程学会, 2009: 2. [7] GB 50660—2011. 大中型火力发电厂设计规范[S]. [8] 电力规划设计总院. 火电工程限额设计参考造价指标[M]. 北京: 中国电力出版社, 2007: 273-276. |
|
|
|