Development of a Composite Tool for Replacing the Glass Insulator with the Electric Charge |
Zhen Zhaohui, Li Wen, Mei Wenjian, He Longfei, Guo Hao |
State Grid Hu’nan Electric Power Company Live Working Center, Changsha 410007 |
|
|
Abstract As a new type of transmission tower, Steel rod has many outstanding advantages in the power construction, because of that it has been widely used in city. Most of the transmission line of the steel pipe is adopt more back using the same tower erection. Due to its structure is compact and the operation space is narrow, it is difficult to replacement of insulators with the electric charge. In this paper, according to the characteristics of the 110~220kV same tower and multi back pipe line, we Developed a live replacement glass insulator tool through the material selection, production and testing of the apparatus. As the same time. The operation method which meeting the requirement of the field operation be proposed through the dangerous rate. The results can provide a reference for the development of steel rods for live working tools and instruments, and is important to promote the steel pole for live working.
|
Published: 19 May 2016
|
|
|
|
Cite this article: |
Zhen Zhaohui,Li Wen,Mei Wenjian等. Development of a Composite Tool for Replacing the Glass Insulator with the Electric Charge[J]. Electrical Engineering, 2016, 17(5): 112-114.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2016/V17/I5/112
|
[1] 郭日彩, 许子智, 李喜来, 等. 110~500kV输电线路典型设计[J]. 电网技术, 2007, 31(1): 56-64. [2] 肖荣华. 带电更换220kV双回直线钢管杆绝缘子方法研究[J]. 中国电业, 2012(11): 248-254. [3] 周秀冬, 蒋正龙, 李波, 等. 220kV多回路钢管杆带电作业新方法研究[J]. 湖南电力, 2013, 33(6): 7-10. [4] 陈国信. 110kV电力线路钢管杆悬垂绝缘子串带电更换研究[J]. 供用电, 2012, 29(1): 73-77. [5] 罗玉鹤. 110kV窄基钢管塔的研究设计[J]. 电力建设, 2010, 31(8): 25-28. [6] Q/GDW 1799.2—2013. 国家电网公司电力安全工程规程线路部分[S]. |
|
|
|