Common problems and preventive measures about electrical systems testing of large units |
Zhang Gang, Zhou Yaqun, He Xinlin |
Xi’an Thermal Power Research Institute Co., Ltd, China Huaneng Group, Xi’an 710043 |
|
|
Abstract This paper summarizes some common design problems, installation problems, operational problems, equipment matching problems through many years of electrical systems testing abuout large units, and analyses the regularity. To void this kind of problems, this paper offers a few preventive measures, including according actions and operation orders strictly, modifying some protection fixed value temporary, applying voltage to PT. It can have a reference effect to the electrical systems testing of large units, help to prevent these kind of problems.
|
Received: 27 November 2017
Published: 21 May 2018
|
|
|
|
Cite this article: |
Zhang Gang,Zhou Yaqun,He Xinlin. Common problems and preventive measures about electrical systems testing of large units[J]. Electrical Engineering, 2018, 19(5): 67-70.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2018/V19/I5/67
|
[1] 兀鹏越, 孙钢虎, 牛利涛, 等. 大型发电机组电气系统整套起动试验常见问题及其处理措施[J]. 热力发电, 2013, 42(1): 100-102. [2] 孙钢虎, 兀鹏越, 牛利涛, 等. 火电机组电气启动试验中的问题及处理[J]. 电力建设, 2012, 33(7): 46-49. [3] 兀鹏越, 胡任亚, 陈飞文, 等. 1036MW机组的电气整套启动调试[J]. 电力建设, 2010, 31(7): 77-79. |
|
|
|