Electrical Engineering  2020, Vol. 21 Issue (12): 45-48    DOI:
Technology & Application Current Issue| Next Issue| Archive| Adv Search |
Research on the method of fast batch conversion of coordinates of total station without prism in electric power survey
Wang Qian1, Wang Yantao2
1. State Grid Tianjin Electric Power Corporation Chengxi District Supply Company, Tianjin 300000;
2. China Energy Engineering Group Tianjin Electric Power Design Institute Co., Ltd, Tianjin 300000

Copyright © Electrical Engineering
Supported by: Beijing Magtech