Analysis and treatment of a single pole blocking caused by a DC wall bushing failure |
Zhang Shihong, Lei Mingdong, Zhang Han, Wang Mian, Hu Huan |
Dali Bureau, CSG EHV Transmission Companies, Dali, Yunnan 671000 |
|
|
Abstract This paper introduces the fault process of single pole blocking caused by DC protection action because of DC through wall bushing fault in ±800kV UHV converter station, analysis the cause of the event and discusses the fault treatment, and puts forward improvement measures.
|
Received: 22 April 2020
|
|
|
|
Cite this article: |
Zhang Shihong,Lei Mingdong,Zhang Han等. Analysis and treatment of a single pole blocking caused by a DC wall bushing failure[J]. Electrical Engineering, 2020, 21(12): 113-118.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2020/V21/I12/113
|
[1] 丁钊, 韩伟强. 天广直流输电系统双极运行情况总结[J]. 电网技术, 2003, 27(9): 49-54. [2] 汪道勇, 黄道春, 崔雨, 等. 葛洲坝换流站D桥差动保护动作原因及整改[J]. 高电压技术, 2008, 34(7): 1504-1508. [3] 余超耘, 蔡泽祥, 李晓华, 等. 换流器直流差动保护动作特性分析与优化[J]. 电网技术, 2015, 39(6): 1744-1750. [4] 赵畹君. 高压直流输电工程技术[M]. 北京: 中国电力出版社, 2004. [5] 浙江大学直流输电科研组. 直流输电[M]. 北京: 水利水电出版社, 1985. [6] 高爱云, 聂娟红, 李晓华, 等. 换流变压器阀侧单相接地故障保护动作分析[J]. 电工电能新技术, 2010, 29(4): 71-75. [7] 梅念, 李银红, 刘登峰, 等. 高压直流输电中阀短路保护的动作方程研究[J]. 中国电机工程学报, 2009, 29(1): 40-47. [8] 张颖, 邰能灵, 徐斌. 高压直流输电系统阀短路保护动作特性分析[J]. 电力系统自动化, 2011, 35(8): 97-102, 107. [9] 梁旭明, 吴巾克, 冀肖彤. 国家电网公司直流输电工程控制保护系统运行情况分析[J]. 电网技术, 2005, 29(23): 7-10, 17. [10] 沈志刚, 张海燕. 南桥换流站阀侧套管故障录波分析及阀短路保护改进建议[J]. 高压电器, 2010, 46(6): 98-102. |
|
|
|