|
|
Design and implementation of post-evaluation system for technical renovation and equipment overhaul project of power grid based on Spark framework |
YANG Hua1, DONG Zhen2, SUN Yi1, GENG Qian1, LI Tianran1 |
1. Electric Power Research Institute of State Grid Hebei Electric Power Co., Ltd, Shijiazhuang 050011; 2. State Grid Hebei Electric Power Co., Ltd, Shijiazhuang 050021 |
|
|
Abstract Project post-evaluation is an important part of the project management process. At present, only some key projects are selected for power grid technical revamping and equipment overhaul projects to carry out post-evaluation pilots, which cannot reflect the overall implementation effect of the project. This paper introduces the process of developing a post-evaluation system for technical revamping and equipment overhaul projects based on the Spark framework. The system uses big data technology to process the basic data of post-evaluation, and uses the multi-level fuzzy comprehensive evaluation method to score project implementation effects, which provides technical support for the normal development of technical revamping and equipment overhaul projects.
|
Received: 09 November 2020
|
|
|
|
Cite this article: |
YANG Hua,DONG Zhen,SUN Yi等. Design and implementation of post-evaluation system for technical renovation and equipment overhaul project of power grid based on Spark framework[J]. Electrical Engineering, 2021, 22(7): 19-25.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2021/V22/I7/19
|
[1] 危怀安, 杜锦. 国外项目后评估研究综述[J]. 科技管理研究, 2020, 40(15): 231-235. [2] 薛玉兰. 基于全寿命管理理念的技术改造项目管理[J]. 华东电力, 2009, 37(4): 557-561. [3] 张丽丽, 张鸣, 郑媛媛, 等. 构建技改修理项目后评价管理体系[J]. 中国电力企业管理, 2013(4): 71-73. [4] 施绮, 王洪飞, 李清龙. 技术改造项目后评价管理的研究与实现[J]. 华东电力, 2014, 42(12): 2731-2734. [5] 王玲, 李效臻. 输变电技改项目后评价指标与方法[J]. 电网与清洁能源, 2014(7): 25-28. [6] 张英. 电网企业技改维修项目后评价方法研究[J]. 中国电业(技术版), 2015(11): 208-211. [7] 曾仲, 柳瑞禹. 电网企业技改项目后评价研究[J]. 商, 2015(3): 263-264. [8] 朱鑫鑫, 朱金龙. 电网技术改造项目经济效益后评价研究[J]. 电力学报, 2017, 32(2): 159-167. [9] 宋连峻, 徐志勇. 电网项目后评价研究——基于改进模糊层次法[J]. 技术经济, 2009, 28(10): 52-54, 119. [10] 郭向铮. 输变电建设项目后评价模型与实证研究[D]. 保定: 华北电力大学, 2012. [11] 张吉军. 模糊层次分析法(FAHP)[J]. 模糊系统与数学, 2000, 14(2): 80-88. [12] SAATY T L.Modeling unstructured decision problems-the theory of analytical hierarchies[J]. Mathematics and Computers in Simulation, 1978, 20(3): 147-158. [13] 李智威, 贺兰菲, 唐学军, 等. 基于大数据的电网实物资产分析评价系统设计与实现[J]. 电气技术, 2019, 20(6): 74-80, 98. [14] 杨宁, 黄婷婷. 基于Spark的大数据分析工具Hive的研究[J]. 计算机时代, 2018, 317(11): 31-35. |
|
|
|