|
|
The Implementation and Improvement of Substation General Fault Signal |
Rao Wei |
School of Electrical and Information Enginerring, Xihua University, Chengdu 610039 |
|
|
Abstract This paper analyzes diverse implementations of substation general fault signals and compares their advantages and shortcomings. Regarding to the easily misoperation drawbacks in the implementation of substation fault signal adopting the non-correspondence method currently, two effective solutions are proposed correspondingly. And they intensively guarantee the security of reset operation of substation general fault signal and strongly improve the stability of monitoring system.
|
Published: 24 June 2014
|
|
|
|
[1] 裴敬生,王伟. 综自系统事故总的合成方式及问题分析[J]. 科技与企业, 2012(24): 331. [2] 王媛婷,郭志彬. 变电站调度事故总信号改进方案[J]. 电力与电工, 2012(4): 86-88. [3] 朱骏. 变电站监控系统事故总信号解决方案探讨[J]. 电力自动化设备, 2007(1): 112-114. [4] 徐于海,干银辉. 变电站自动化系统中事故总信号现状及问题[J]. 江苏电机工程, 2004(2):62-63. [5] 芮丽娟. 110kV南渡变无人值班改造中事故总信号的实现[J]. 机电信息, 2009(36): 183. [6] 郝春赫,容春艳. CZX12R1操作箱事故总回路误起动原因分析[J]. 河北工程技术高等专科学校学报, 2011(4): 30-33. [7] 孟伟. 关于升压站NCS远动事故总信号的探讨[J]. 科技视界, 2012(30): 113, 117. |
|
|
|