Analysis of a Single to Ground Fault in Neutral Unearthed System |
Wang Wei, Wang Xu, Yang Shibo, Lu Fengchao, Cheng Fangyuan |
1.Jiangsu Nuclear Power Corporation, Lianyungang, Jiangsu 222042; 2. North China electric power university, Baoding, Hebei 071003 |
|
|
Abstract The Unit diesel generators, as the core equipment of NPS reliable power supply, is very important to NPS safety. Especially at the stage of post Fukushima stage, realizing of step-by-step loading of the Unit diesel generator under the Unit accident condition play significant role in ensuring the Unit safety. On the basis of practical commissioning and running experience of Stage I,diesel unit loading designwere improved and the step-by-step loading design scheme of Unit 3&4 was proposed. It lays a solid foundation for the smooth construction of Unit 3&4.
|
Published: 04 November 2014
|
|
|
|
[1] 贺家李, 宋从矩.电力系统继电保护原理[M].3版.北京:中国电力出版社, 1994. [2] 李福寿. 中性点非有效接地电网的运行[M]. 北京:水利电力出版社, 1993. [3] 方大千.电力计算手册[M].济南:山东科学技术出版社,1993. [4] 陈浩. 微机保护原理及算法仿真[M]. 北京:中国电力出版社, 2007. [5] 葛耀中. 新型继电保护和故障测距原理与技术[M]. 2版. 西安:西安交通大学出版社, 2007. [6] 梁睿,辛健,王崇林.应用改进型有功分量法的小电流接地选线[J].高电压技术,2010,36(2): 375-379. [7] 潘馨雨,张新慧,哈恒旭.浅析小电流接地系统暂态选线新方法[J].国网技术学院学报, 2013(5): 37-41. [8] 姚轲,魏秋辉,张朋飞,等. 小电流接地系统谐振产生的原因及防范措施[J].自动化应用,2013(5):84-85. |
|
|
|