Electrical Engineering  2015, Vol. 16 Issue (02): 101-102    DOI:
Technology & Application Current Issue| Next Issue| Archive| Adv Search |
Parallel Running Evaluation of 220kV On-load-tap-changing Transformers with Different Parameters
Chen Qinghe1, 2, Guo Xiaofang1, 2, Lin Jie2
1. State Grid Fujian Fuzhou Electric Power Supply Company, Fuzhou 350009; 2. Fuzhou Electric Power Design Institute Co., Ltd, Fuzhou 350007

Copyright © Electrical Engineering
Supported by: Beijing Magtech