电气技术  2020, Vol. 21 Issue (3): 137-140    DOI:
技术与应用 |
变压器铁心接地电流异常分析与处理
靳鹏超, 王立楠
中国大唐集团科学技术研究院有限公司华中电力试验研究院,郑州 450000
Analysis and treatment of abnormal grounding current of transformer core
Jin Pengchao, Wang Li'nan
China Datang Group Science and Technology Research Institute Co., Ltd, Huazhong Electric Power Research Institute, Zhengzhou 450000
全文: PDF (3765 KB)   HTML (1 KB) 
输出: BibTeX | EndNote (RIS)      
摘要 本文针对引起电力变压器铁心接地电流异常的外部原因、内部原因、特殊原因进行了分析,针对三类原因采用接地电流测试、色谱分析、绝缘电阻三种方法对异常原因进行分析判别,采用限流电阻、电容冲击、电焊机、吊罩检查法对异常电流进行处理。通过引下线绝缘破损、金属异物搭接、电容冲击法对故障进行定位处理、对运行中的变压器采用限流电阻法限制故障电流实际案例分析论证。保证变压器的正常运行。提出相关建议,对于变压器铁心接地电流运行维护具有重要的参考意义。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
靳鹏超
王立楠
关键词 接地电流异常外部原因内部原因特殊原因    
Abstract:In this paper, the external causes, internal causes and special causes of the abnormality of the grounding current of the power transformer core are analyzed. The grounding current test, chromatographic analysis and insulation resistance are used to analyze and discriminate the abnormal causes for three types of reasons. The current limiting resistor is used. The capacitor current, the electric welder, and the hood inspection method process the abnormal current. The fault is located by the insulation damage of the down conductor, the metal foreign object overlap, the capacitance impact method, and the actual case analysis of the fault current is limited by the current limiting resistor method. Ensure the normal operation of the transformer. Suggestions are put forward, which have important reference significance for the operation and maintenance of transformer core grounding current.
Key wordsground current abnormality    external cause    internal cause    special cause   
收稿日期: 2019-08-29      出版日期: 2020-03-20
作者简介: 靳鹏超(1990-),男,本科,主要从事一次高压电气试验工作。
引用本文:   
靳鹏超, 王立楠. 变压器铁心接地电流异常分析与处理[J]. 电气技术, 2020, 21(3): 137-140. Jin Pengchao, Wang Li'nan. Analysis and treatment of abnormal grounding current of transformer core. Electrical Engineering, 2020, 21(3): 137-140.
链接本文:  
https://dqjs.cesmedia.cn/CN/Y2020/V21/I3/137