    					| Implementation of the IT System in the Subsatation Grounding System of Off Shore Platform |  
						| Xu Zhongshu |  
						| Schneider Electric (China) Co., Ltd, Beijing 100102 |  
						|  |  
					
						| 
								
									| 
											
                        					 
												
													
													    |  |  
														| 
													
													    | Abstract  This document analyze the substation grounding system of offshore platform which may be normal operation and abnormal operation. The insulation monitoring system solution, including simple systems, stand-alone systems and integrated systems, can effectively ensure a continuous supply of the system and supply reliability. |  
															| Published: 28 March 2013 |  |  |  |  
														
															| Cite this article: |  
															| Xu Zhongshu. Implementation of the IT System in the Subsatation Grounding System of Off Shore Platform[J]. Electrical Engineering, 2013, 14(03): 53-57. |  |  |  
															|  |  |  |  
															| URL: |  
															| https://dqjs.cesmedia.cn/EN/Y2013/V14/I03/53 |  
													
																												  
															| [1] Schneider Electric.电气装置应用(设计)指南(第2版).北京:中国电力出版社,2008. [2] 中国航空规划设计研究院组编.工业与民用配电设计手册[M].北京:中国电力出版社,2005.
 [3] Schneider Electric.绝缘监测装置Vigilohm.2001.1.
 [4] 《海洋石油工程设计指南》编委会.海洋石油工程电气、仪控、通信设计[M].北京:石油工业出版社,2007.
 [5] 中国建筑学会建筑电气分会.民用建筑电气设计规范实施指南[M].北京:中国电力出版社,2008.
 [6] [印度]谢尔德拉克(Shel-drake,A.L.)..电气工程手册[M].孙洪程,马昕,王同浩,译.北京:化学工业出版社,2006.
 [7] 中国船级社.海上固定平台入级与建造规范[M].北京:人民交通出版社,1992.
 [8] 中国船级社.海上移动平台入级与建造规范[M].北京:人民交通出版社,2005.
 |  
											 
											 |  |  |