    					| The Design Scheme of Step by Step Loading for Unit Diesel Engine of TNPS units 3&4 |  
						| Hu Bin1, Peng Yingjie2 |  
						| Shanxi Department of Yulin-to-Jinan Gas Pipeline company, Sinopec, Ji’nan 250101 |  
						|  |  
					
						| 
								
									| 
											
                        					 
												
													
													    |  |  
														| 
													
													    | Abstract  In consideration of the practical situation and the remaining problems for the substation, this paper make a summary of the technical measures to improve the reliability of power supply system for the compressor station. |  
															| Published: 04 November 2014 |  |  |  |  
														
															| Cite this article: |  
															| Hu Bin,Peng Yingjie. The Design Scheme of Step by Step Loading for Unit Diesel Engine of TNPS units 3&4[J]. Electrical Engineering, 2014, 15(10): 67-70. |  |  |  
															|  |  |  |  
															| URL: |  
															| https://dqjs.cesmedia.cn/EN/Y2014/V15/I10/67 |  
													
																												  
															| [1] Requirement spectification,detail stage 4 of the process engineering description for reactor limitation and control system(RLCS) Pre.A,Areva Co., 2013. [2] Concept for the Automatic Power Control System, Siemens Co., 2013.
 [3] Initial data for development of safety I&C LEFU1-3, JSC SPbAEP, 2013.
 [4] 机组柴油机控制系统说明书,ALSTOM-18PA6B, 2013.
 |  
											 
											 |  |  |