Electrical Engineering  2014, Vol. 15 Issue (10): 67-70    DOI:
Technology & Application Current Issue| Next Issue| Archive| Adv Search |
The Design Scheme of Step by Step Loading for Unit Diesel Engine of TNPS units 3&4
Hu Bin1, Peng Yingjie2
Shanxi Department of Yulin-to-Jinan Gas Pipeline company, Sinopec, Ji’nan 250101

Download: PDF (831 KB)   HTML (1 KB) 
Export: BibTeX | EndNote (RIS)      
Abstract  In consideration of the practical situation and the remaining problems for the substation, this paper make a summary of the technical measures to improve the reliability of power supply system for the compressor station.
Key wordssubstation      reliability      shake      fast cutting device      preventive test      load     
Published: 04 November 2014
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
Hu Bin
Peng Yingjie
Cite this article:   
Hu Bin,Peng Yingjie. The Design Scheme of Step by Step Loading for Unit Diesel Engine of TNPS units 3&4[J]. Electrical Engineering, 2014, 15(10): 67-70.
URL:  
https://dqjs.cesmedia.cn/EN/Y2014/V15/I10/67
Copyright © Electrical Engineering
Supported by: Beijing Magtech