    					| 110kV substation Economic Operation and Efficiency Analysis |  
						| Li Jianjun, Liu Xiaolin, Yuan Zhenlin |  
						| Yueyang Power Company,Yueyang, Hu’nan 414000 |  
						|  |  
					
						| 
								
									| 
											
                        					 
												
													
													    |  |  
														| 
													
													    | Abstract  Yueyang Power Grid 110kV substation as an example,confirmed the reasonable necessity of choice substation operation mode,The results can be used to real-time monitoring and scheduling of the main transformer switching way to achieve economic operation of the power grid,reduce the power loss of the transformer,improve economic efficiency. |  