Measures for Three-phase Unbalance based on PSCAD |
Huang Guilan1, 2, Cai Jinding1, Lin Han3 |
1. Electric and Automation School of Fuzhou University, Fuzhou 350116; 2. Technology Center of Fujian Electric Power Co., Ltd, Fuzhou 350007; 3. Fujian Electric Power Co., Ltd, Fuzhou 350003 |
|
|
Abstract Power demand is rising fast as the rural areas undergo dramatic economic growth. Long-delayed construction of rural power distribution network and uneven electricity load lead to the serious low voltage phenomenon. The serious three-phase unbalance, short of reactive power compensation, long distances of power supply and small wire section area are the main causes of low voltage. This article firstly analyzes the causes of the low voltage, especially in the three-phase unbalance. Secondly, it also raises the management and technical measures for the low voltage in connection with the cause of three-phase unbalance. Finally, it builds the actual rural distribution network model by PSCAD/EMTDC simulation software. And it uses the simulation to check the measures for three-phase unbalance and provides the basis for the low voltage of the rural power distribution network.
|
Published: 20 July 2015
|
|
|
|
[1] 赵俊光, 王主丁, 乐欢. 中压配电网规划中馈线电气计算的估算方法[J]. 电力系统自动化, 2008, 32(16): 98-102. [2] 叶云, 王主丁, 张宗益, 等. 一种规划态配网理论线损估算方法[J]. 电力系统保护与控制, 2010, 38(17): 82-86. [3] SD 292—1988. 架空配电线路及设备运行规程[S]. [4] 林志雄, 陈岩, 蔡金锭, 等. 低压配电网三相不平衡运行的影响及治理措施[J]. 电力科学与技术学报, 2009, 24(3): 63-67. [5] 黄前华, 郑世芳.自耦变压器电流、电压、容量关系分析及设计[J]. 技术与应用, 2006, 12: 20-25. [6] GB/T 12325—2008. 电能质量 供电电压偏差[S]. |
|
|
|