The Optimization of Construction Scheme of Merging Unit of the Smart Substation Upgrade
Wang Pengmin
State Grid Maintenance Company of Shanxi Electric Power Corporation, Taiyuan 030032

Download: PDF (235 KB)   HTML (1 KB) 
Export: BibTeX | EndNote (RIS)      
Abstract  With smart substation technology becoming more mature, the early pilot of samart substation in daily operation gradually exposed some issues which affecting the safe operation of the power grid. This paper mainly according to the characteristics of the merging unit and the different voltage class, take the 500kV G smart substation in the province which have been putted into operation early and completed construction recently, introduces the practical and feasible optimizing construction scheme in detail, and discusses the key technologies and dangerous points involved in this scheme. The successful accomplishment of renovation project, not only validated the industrial applicability of the optimizing construction scheme, accumulated the related working experience, and more have a valuable reference to the other similar construction project of smart substation in the future.
Key wordssmart substation      merging unit      optimize      construction scheme     
Published: 20 September 2017
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
Wang Pengmin
Cite this article:   
Wang Pengmin. The Optimization of Construction Scheme of Merging Unit of the Smart Substation Upgrade[J]. Electrical Engineering, 2017, 18(9): 118-124.
URL:  
https://dqjs.cesmedia.cn/EN/Y2017/V18/I9/118
Copyright © Electrical Engineering
Supported by: Beijing Magtech