The practice of expansion bays in 500kV smart substation without merging units |
Rao Wei |
Maintenance Branch of Jiangsu Electric Power Co., Ltd, Changzhou, Jiangsu 213000 |
|
|
Abstract With regard to the disadvantages appeared in the operating of 500kV smart substation with conventional transformers and merging units, the State Grid Corporation of China intends to remove the merging units and plans to adopt the mode of the cable directly sampling. Before the removing merging units project is carried out, the pattern that expanding bays without merging units directly is adopted. In this paper, the mixed sampling mode during this transition period is discussed, and the corresponding operation and maintenance points are proposed.
|
Received: 13 April 2019
Published: 29 September 2019
|
|
|
|
[1] 殷志良, 李敏, 袁成, 等. 数字化变电站合并单元的应用和测试[J]. 供用电, 2011, 28(5): 37-39, 45. [2] 胡国, 唐成虹, 徐子安, 等. 数字化变电站新型合并单元的研制[J]. 电力系统自动化, 2010(24): 51-54. [3] 李超, 徐启峰. 合并单元时间同步系统的现状与发展[J]. 电气技术, 2013, 14(9): 1-5. [4] 吴爱军. 智能变电站合并单元现状及发展方向[J]. 科技创新导报, 2015(1): 85-86, 88. [5] 王鹏敏. 智能变电站合并单元升级改造施工方案优化[J]. 电气技术, 2017, 18(9): 118-124. [6] 鲍辉. 浅谈智能变电站的优点及运行维护[J]. 中国新技术新产品, 2013(13): 86-87. [7] 冯正伟,汪铭峰,何祥文. 500kV智能变电站合并单元运行维护及异常分析[J]. 中国电力, 2015, 48(9): 95-99. [8] 陈瑞章. 智能变电站合并单元的运行注意事项[J]. 通讯世界, 2015(11): 160. [9] 王子婷. 智能变电站合并单元异常情况分析及运行维护方案研究[J]. 电子制作, 2016(2): 28-29. |
|
|
|