Electrical Engineering  2021, Vol. 22 Issue (10): 84-87    DOI:
Maintenance & Fault Diagnosis of Electrical Equipment Current Issue| Next Issue| Archive| Adv Search |
Function improvement and experimental analysis of the back-up-switchover-unit
SUN Dagen
CHN Energy Daduhe Pubugou Hydropower General Plant, Yaan, Sichuan 625304

Download: PDF (774 KB)   HTML (1 KB) 
Export: BibTeX | EndNote (RIS)      
Abstract  The back-up-switchover-unit can put the standby power supply into operation quickly after the working power supply is disconnected due to fault or other reasons. However, if the working power supply trips due to short circuit at the load end, the tripping signal of the power supply protection device shall block the action of the back-up-switchover-unit, otherwise the standby power supply will also be closed in the fault and lead to secondary damage. Based on the field test, this paper analyzes the problems existing in the locking function of the back-up-switchover-unit, and puts forward the corresponding solutions, which improves the reliability of the back-up-switchover-unit.
Key wordsthe back-up-switchover-unit      the locking function      test      analysis     
Received: 27 April 2021     
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
SUN Dagen
Cite this article:   
SUN Dagen. Function improvement and experimental analysis of the back-up-switchover-unit[J]. Electrical Engineering, 2021, 22(10): 84-87.
URL:  
https://dqjs.cesmedia.cn/EN/Y2021/V22/I10/84
Copyright © Electrical Engineering
Supported by: Beijing Magtech