Abstract:Due to the power system voltage rising caused by excess reactive power during the valley load, This paper mainly talk about the test on of generator, according to which the system voltage is adjusted to a reasonable extent. Experiment proved that the method is practical and effective.
薛敏, 郑惠萍, 杨尉薇. 600MW发电机进相运行对系统电压的影响[J]. 电气技术, 2013, 14(12): 81-82.
Xue Min, Zheng Huiping, Yang Weiwei. Impact of Leading Phase Operation of 600MW Generator on System Voltage. Electrical Engineering, 2013, 14(12): 81-82.