Transmission Line Linear Dreaking Strain Methods of Change
Li Chunsheng, Xiao Chunwei, Guo Xiaofeng
Pingdingshan He’nan Electric Power Company Power Company Maintenance Department Maintenance Department Seized Power Transmission Transportation Professionals, Pingdingshan, He’nan 467001
Abstract:This article describes the tower without anchoring both ends of the ground guide ways, and then mark it on the tower, so that the ground lead to the ground after loosening, mark the outside of the ground in the guide, the guide is fixed and tightened breaking ground, pressed clamp on cables connected. The traditional way to solve a complex operating procedures hang tight, realized using small pole (or use an existing tower fixed point) to the linear transmission line method for breaking job-resistant sheets changed, the objective being to solve the transformation of the traditional environmental impact of power lines (eg length o'clock officers dispersed, Channel hard) and anchor lines, pumping long lines and other lines of construction period of transformation difficulties.