Abstract:In recent years, the quality control of circuit breaker is not strict during the installation process, leading to the foreign bodies entering and the poor installation quality, which causes the internal discharge fault of the circuit breaker during commissioning. By analyzing the faults of two 500kV tank circuit breakers. In the installation stage, there is not strictly in accordance with the operating standards, resulting in insect entring and closing resistance misalignment, internal breakdown fault occurred during the commissioning process. It is of great significance for the safe and stable operation of circuit breakers to strengthen the supervision of the installation stage, to strengthen the acceptance and storage of circuit breakers, the quality management of installation, the inspection of installation environment, the management of components and the supervision of commissioning stage, and to operate strictly in accordance with standardization.
胡全义, 张阳, 左秀江, 张星宇, 刘天奇. 浅析罐式断路器安装调试阶段监督的重要性[J]. 电气技术, 2019, 20(10): 110-113.
Hu Quanyi, Zhang Yang, Zuo Xiujiang, Zhang Xingyu, Liu Tianqi. The importance of supervision in installation and commissioning of tank circuit breakers. Electrical Engineering, 2019, 20(10): 110-113.