|
|
Research of the Evaluation on Transfer Capability of 500kV Interconnected Transmission Grid |
Zhao Guangping |
China National Heavy Machinery Corporation, Beijing 100036 |
|
|
Abstract A system of guideline to assess the 500kV interconnected grid’s transfer capability is created in the textual. The present conditions of 500kV power grid and affective factors is analyzed, and set up many specific indicators firstly. And then fuzzy integrated evaluation theory is used to establish the evaluation steps. At last some neighbor districts’real grid data is used as an example to test the system. The result show that evaluation system can meet the demand of estimate 500kV interconnected power grid’s transfer capability.
|
Received: 26 June 2014
Published: 26 June 2014
|
|
|
|
Cite this article: |
Zhao Guangping. Research of the Evaluation on Transfer Capability of 500kV Interconnected Transmission Grid[J]. Electrical Engineering, 2013, 14(01): 36-38.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2013/V14/I01/36
|
|
|
|