Three Cities of Northern Xinjiang Grid Reinforcement Program Analysis |
Chen Cheng1, Guan Wenting2 |
1. Xinjiang Electric Power Design Institute, Urumqi 830001; 2. North China Electric Power University, Beijing 102206 |
|
|
Abstract During the “12th Five-Year Plan”, three cities in northern xinjiang are planning morepower. Apart from hydropower and wind power of Altay and Tacheng, Hefeng power plants, Karamaythermal power plants, Fuhai thermal power plants, Beitun thermal power plants and other large andmedium-sized thermal power project planned to put into operation around 2012 to 2014. By then threecities in northern xinjiang will be a large number of surplus. This paper through the stability calculation, researched the transmission capacity of the existing power grid. Finally according to the results of thepower grid surplus power and power grid transmission capacity, researched the need for gridreinforcement and construction programmes.
|
Received: 26 June 2014
Published: 25 July 2013
|
|
|
|
[1] 刘新东.10~35kV 配网铁磁谐振过电压的表现形式及消除措施[J].电工技术杂志, 2000(6): 45-46. [2] 周洁莲, 吴少珍.防止电压互感器的铁磁谐振过电压的有效措施[J].高电压技术, 2001(7): 53-55. [3] 张军.防止铁磁谐振型电压互感器.天津泰莱电气设备有限公司, 2000. [4] 张健.中压电网电压互感器相关问题及其抑制技术的研究[D].北京:华北电力大学, 2006. |
|
|
|