Simulation Study of One Oversea Oil Field Power System |
Mei Yewei, Liu Zhaoxia, Zhang Long, Zhang Detao |
China Petroleum Engineering Co., Ltd, Beijing 100085 |
|
|
Abstract Power supply for oil & gas field in Middle EAST and Africa is usually from the field self-built gas-turbine generator power plant, whose capacity is from several megawatts to hundreds of megawatts and the power plant is usually isolated operated. Main loads of oil & gas field are large rating pump and compressor driven by asynchronous motor and sometimes the rating of one motor can reach several megawatts. These characteristics result in the oil & gas field power system operated in harsh condition, especially when the motor is started DOL. So during engineering of the oil & gas field power system, simulation study based on power system analysis software must be needed to ensure the stability and reliability.
|
Published: 10 October 2013
|
|
|
|
[1] ETAP 11.0 User Guide. Operation Technology, Inc., 2011. [2] International Electrotechnical Commission. IEC 60909 Short-circuit currents in three-phase a.c. systems-Part 0: Calculation of currents, 2001. [3] International Electrotechnical Commission. IEC 60909 Short-circuit currents in three-phase a.c. systems-Part 1: Factors for the calculation of short-circuit currents according to IEC 60909-0, 2002. [4] International Electrotechnical Commission. IEC 60909 Short-circuit currents in three-phase a.c. systems -Part 2: Data of electrical equipment for short-circuit current calculations, 2008. [5] Iran Petroleum Standard. IPS-E-EL-100(0) Engineering standard for electrical system design(Industrial and non-industrial), 1997. [6] 唐春华. ETAP 软件在大型石化企业电力系统中的应用[J]. 电气技术,2007(Z): 1-5. |
|
|
|