The Design Scheme of Step by Step Loading for Unit Diesel Engine of TNPS units 3&4 |
Hu Bin1, Peng Yingjie2 |
Shanxi Department of Yulin-to-Jinan Gas Pipeline company, Sinopec, Ji’nan 250101 |
|
|
Abstract In consideration of the practical situation and the remaining problems for the substation, this paper make a summary of the technical measures to improve the reliability of power supply system for the compressor station.
|
Published: 04 November 2014
|
|
|
|
Cite this article: |
Hu Bin,Peng Yingjie. The Design Scheme of Step by Step Loading for Unit Diesel Engine of TNPS units 3&4[J]. Electrical Engineering, 2014, 15(10): 67-70.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2014/V15/I10/67
|
[1] Requirement spectification,detail stage 4 of the process engineering description for reactor limitation and control system(RLCS) Pre.A,Areva Co., 2013. [2] Concept for the Automatic Power Control System, Siemens Co., 2013. [3] Initial data for development of safety I&C LEFU1-3, JSC SPbAEP, 2013. [4] 机组柴油机控制系统说明书,ALSTOM-18PA6B, 2013. |
|
|
|