Abstract The article describes the substation operation without overhaul for middle switch cabinet. In order to adapt to different construction environment, we need to be equipped with different length of cable. In order to reduce labor intensity, improve work efficiency, ensure safety, we have studied The 10kV630A cable fast conversion Device. The current level of technology are discussed. The structure, testing standard and the use of the device is analyzed.
|
Published: 22 December 2014
|
|
|
|
Cite this article: |
Zuo Jing. The Study and Application Prospect of Fast Conversion Connector Device for 10kV 630A Cable[J]. Electrical Engineering, 2014, 15(12): 92-94.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2014/V15/I12/92
|
[1] 罗俊华, 张丽, 等. 电场应力控制锥的数值分析[J].广东电缆技术, 2003(1): 8-30. [2] 戴征宇, 姜芸, 等. 预制型电缆附件沿面放电试验研究[J]. 高电压技术, 2002, 28(9): 7-81. [3] 张锦秀, 蓝耕, 范云刚, 等. 柔性电缆插拔式快速终端和接头绝缘结构分析[J]. 高电压技术, 2005, 31(1): 25-44. [4] 张锦秀, 蓝耕, 范云刚, 等. 带电旁路作业用插拔式快速电缆终端和接头[J]. 高电压技术, 2005, 31(1): 25-44. |
|
|
|