Abstract In order to guarantee the power supply of DC load in substation, temporary batteries is required on Checking the capacity of the substation’s batteries for running, or only the 50% capacity discharging test is allowed. This paper introduced three kinds of wiring schemes for 50% capacity discharge test, and discussed the matters needing attention in these tests with their advantages or disadvantages.
|
Received: 20 April 2015
Published: 23 March 2015
|
|
|
|
[1] 中华人民共和国国家经济贸易委员会. DL/T 724—2000 电力系统用蓄电池直流电源装置运行与维护技术规程[S]. 北京: 中国电力出版社, 2001. [2] 李晶, 丁丹一, 等. 变电站阀控式铅酸蓄电池50%放电测试的研究[J]. 蓄电池, 2010(2): 82-84. |
|
|
|