Optimization of Voltage Level Selection of 1000MW Units in Power Plant |
Li Jianqiang |
Datang Sanmenxia Power Generation Co., Ltd, Sanmenxia, He’ nan 472143 |
|
|
Abstract In order to solve the problem of power plant 1000MW unit plant with large capacity motor starting with the system short-circuit voltage motor feedback current problems such as the difficulty and high plant. Combining with the system wiring mode and load characteristics of 1000MW unit expansion project factory, load analysis to determine the high plant transformer and standby transformer capacity and number of, from the start of induced draft fan, high plant transformer and standby transformer type, switch equipment selection, and the high voltage switch cabinet layout mature, wiring and other aspects of the 6kV, 10kV two auxiliary power wiring scheme comparison of technology and economy, proposes the use of electric system design pressure plant optimal. The results show that, the auxiliary system adopts the following scheme more reasonable, the 10kV voltage level voltage is high pressure plant, each unit is provided with a high voltage transformer, a 2 bus, responsible for unit load and the public power supply. Two units with a splitting variable as the startup/standby transformer.
|
Published: 09 December 2015
|
|
|
|
[1] 火力发电厂厂用电技术规定. DL/T 5153—2002[Z]. 2002. [2] 三门峡火电厂三期扩建2×1000MW机组工程勘测设计投标文件. 河南电力勘测设院[Z]. 2008. [3] 郭茹. 三门峡火电厂三期扩建工程2×1000MW机组初步设计[Z]. 2013. [4] 杜亮,刘小彩. 电工基础[M]. 北京: 中国水利水电出版社, 2004. [5] 李光琦. 电力系统暂态分析[M]. 北京: 水利电力出版社, 1985. [6] 国家电力调度通信中心. 电力系统继电保护典型故障分析电力系统暂态分析[M]. 北京: 中国电力出版社, 2001. [7] 电力工程电气设计手册. 电气一次部分[M]. 北京:中国电力出版社, 1991. [8] 电力工程电气设计手册. 电气二次部分[M]. 北京:中国电力出版社, 1991. [9] 国家电力调度中心. 电力系统继电保护实用技术问答[M]. 北京: 中国电力出版社. 1999.10. |
|
|
|