Electrical Engineering  2017, Vol. 18 Issue (10): 74-78    DOI:
Research & Development Current Issue| Next Issue| Archive| Adv Search |
Study on Medium and Long Term Load Forecasting of Developed Area based on AHP and Fuzzy Clustering Method
Wu Wenxin
State Grid Anhui Chizhou Guichi District Electric Power Company, Chizhou, Anhui 247100

Copyright © Electrical Engineering
Supported by: Beijing Magtech