|
|
Research on Digital Transfer Mechanism of Power grid Project and its Solution |
Zhang Yongzhi, Zhang Liang, Zhang Zhaohu, Ding Lei |
Power China Hubei Electric Engineering Corporation, Wuhan 430040 |
|
|
Abstract The long-term and complexity of power grid construction put forward higher requirements on information sharing of power grid projects. A lot of engineering drawings, digital model and documentation have gradually accumulated during the project construction, In order to transfer these data to proprietor or other third-party. According to the basic workflow of digital transfer, Paper expounded the specific content and working mechanism for power grid projects. Then two solutions of digital transfer have presented according to actual demand. Some suggestions and expectation for carrying out the work of digital transfer are proposed at the end of this paper.
|
Published: 23 May 2017
|
|
|
|
Cite this article: |
Zhang Yongzhi,Zhang Liang,Zhang Zhaohu等. Research on Digital Transfer Mechanism of Power grid Project and its Solution[J]. Electrical Engineering, 2017, 18(5): 87-91.
|
|
|
|
URL: |
http://dqjs.cesmedia.cn/EN/Y2017/V18/I5/87
|
[1] 李兴源, 魏巍, 王渝红, 等. 坚强智能电网发展技术的研究[J]. 电力系统保护与控制, 2009, 37(17): 1-7. [2] 吴志力, 韩文军. 电网工程数字化移交工作的必要性和紧迫性[J]. 电力建设, 2014, 35(2): 66-69. [3] 颜伟, 文旭, 余娟, 等. 智能电网环境下电力市场面临的机遇与挑战[J]. 电力系统保护与控制, 2010, 38(24): 224-230. [4] 王聪生. 新建电厂数据移交的方法[J]. 中国电力, 2008, 41(1): 79-82. [5] 刘文, 杨慧霞, 祝斌. 智能电网技术标准体系研究综述[J]. 电力系统保护与控制, 2012, 40(10): 120-126. [6] 黄增宏. 电力工程设计数字化移交的实施案例[J]. 高科技与产业化, 2009, 5(8): 92-94. [7] 叶文辉. 电力企业数字化移交平台建设[J]. 福建电脑, 2012, 28(10): 163-164. [8] 韩笑, 狄方春, 刘广一, 等. 应用智能电网统一数据模型的大数据应用架构及其实践[J]. 电网技术, 2016(10). [9] 刘巍, 黄曌, 李鹏, 等. 面向智能配电网的大数据统一支撑平台体系与构架[J]. 电工技术学报, 2014(S1): 486-491. [10] 刘军. 三维数字化移交提高项目管理水平[J]. 中国建设信息化, 2015(20): 43-47. |
|
|
|