|
|
Analysis and discussion on the abnormal test of generator insulation test |
Xu Qingxin |
Huaneng (Shanghai) Electric Power Maintenance Co., Ltd, Shanghai 200942 |
|
|
Abstract The synchronous generator is the heart of the power system. It can work reliably and directly affects the safety and quality of the power supply. The generator in the manufacturing process, the insulation may be damaged, the formation of weakness in the operation process, will continue to suffer vibration, fever, corona, chemical corrosion and mechanical force, so the various parts of it are gradually aging, and influence with other parts of operation, until the damage. Thus it affects the safe operation of the generator. In order to find out the insulation defects of the generator, it is very necessary to carry out the generator preventive test.
|
Received: 21 March 2018
Published: 23 October 2018
|
|
|
|
[1] 李建明, 朱康. 高压电气设备试验方法[M]. 北京: 中国电力出版社, 2001. [2] 单文培. 电气设备试验及故障处理实例[M]. 北京: 中国水利水电出版社, 2012. [3] 中华人民共和国工业部. DL/T 596—1996. 电力设备预防性试验规程[S]. [4] 东北电力集团公司. 电力工程师手册(电气卷)[M]. 北京: 中国电力出版社, 2002. [5] 李德存, 马捍超, 刘磊, 等. 1100MW水内冷汽轮发电机定子绕组耐压试验分析[J]. 电气技术, 2014, 12(4): 66-68, 72. [6] 陈飞文, 兀鹏越, 陈佳佳, 等. 发电机外部“定子接地”故障分析及处理[J]. 电气技术, 2013, 12(11): 58-61. [7] 国建鸿, 顾国彪, 傅德平, 等. 330MW蒸发冷却汽轮发电机冷却技术的特点及性能[J]. 电工技术学报, 2013, 7(3): 134-139. [8] 顾国彪, 阮琳, 刘斐辉, 等. 蒸发冷却技术的发展,应用和展望[J]. 电工技术学报, 2015, 12(11): 1-6. [9] 陈天翔, 王寅仲. 电气试验[M]. 北京: 中国电力出版社, 2005. [10] 陈化钢. 电气设备预防性试验方法及诊断技术[M]. 北京: 中国科学技术出版社, 2001. |
|
|
|