The Analysis of 110kV Substation Blackout Accident because of the Lightning |
Yang Shan1, Zhuo Chen2, Lin Kui1, Lin Yi1 |
1. State Grid Zhoushan Power Supply Company, Zhoushan, Zhejiang 316000;
2. Zhejiang Zheneng Zhongmei Zhoushan Caol & Electricity Co., Ltd, Zhoushan, Zhejiang 316000; |
|
|
Abstract This article analyzes a 110kV substation blackout accident because of the two parallel lines on the same tower were struck by lightning, discusses the operation process of the relay protection and the reason of station blackout accident, and according to the actual substation operation characteristics, puts forward the corresponding improvement measures.
|
Published: 19 April 2017
|
|
|
|
Cite this article: |
Yang Shan,Zhuo Chen,Lin Kui等. The Analysis of 110kV Substation Blackout Accident because of the Lightning[J]. Electrical Engineering, 2017, 18(4): 153-155.
|
|
|
|