Electrical Engineering  2021, Vol. 22 Issue (10): 34-42    DOI:
Research & Development Current Issue| Next Issue| Archive| Adv Search |
Unit commitment rolling optimization of power system with a large-scale wind farm considering time-varying reserve requirement
GUI Qianjin1, HUANG Xiangqian1, MAI Li2, XU Ruixiang1
1. Anqing Power Supply Company, State Grid Anhui Electric Power Co., Ltd, Anqing, Anhui 246003;
2. State Grid Anhui Electric Power Co., Ltd, Hefei 230022

Copyright © Electrical Engineering
Supported by: Beijing Magtech