Electrical Engineering  2024, Vol. 25 Issue (2): 79-84    DOI:
Technology & Application Current Issue| Next Issue| Archive| Adv Search |
Key factors restricting accurate control of high load in Ge-Nan direct current project
FU Guangxu, WANG Yongping, LUO Jinhui
NR Electric Co., Ltd, Nanjing 211102

Download: PDF (815 KB)   HTML (1 KB) 
Export: BibTeX | EndNote (RIS)      
Abstract  In 2023, Ge-Nan DC project carried out the renovation of control, protection and converter valves. During the trial operation, there was an abnormal situation where the power did not reach 1 160MW due to overload limiting current. Therefore, the reason why the DC voltage at the sending end cannot reach the rated voltage during high load operation after the renovation of DC line is analyzed firstly. On this basis, the key factors restricting accurate control of high load are analyzed, including low AC voltage or low converter gear, higher relative DC inductive voltage drop set in the control than the actual value, and extinction angle operating above the rated reference value. Subsequently, a brief analysis is conducted on the impact of measurement error of DC voltage, deviation of DC line resistance and forward pressure drop of converter valve on accurate control of DC power. Finally, targeted solutions are proposed and validated through the real-time digital simulation platform.
Key wordsDC transmission      accurate control      overload limitation      high load      line renovation     
Received: 13 November 2023     
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
FU Guangxu
WANG Yongping
LUO Jinhui
Cite this article:   
FU Guangxu,WANG Yongping,LUO Jinhui. Key factors restricting accurate control of high load in Ge-Nan direct current project[J]. Electrical Engineering, 2024, 25(2): 79-84.
URL:  
https://dqjs.cesmedia.cn/EN/Y2024/V25/I2/79
Copyright © Electrical Engineering
Supported by: Beijing Magtech