110kV Dike North Changed Design Features of Different New |
Xie Jing |
Xuzhou Huadian Electric Power Survey and Design Company Limited, Xuzhou, Jiangsu 221005 |
|
|
Abstract The rapid development of urban land increasingly scarce and contradictory, making the city substation optimized design has become an important issue. In this paper, a substation, for example, Xuzhou City,,elaborated through new technology, new equipment, adopt, adjust the substation functional partitioning methods such as optimization, reducing the substation building area and covers, substation design for the city to provide a reference.
|
Published: 21 May 2014
|
|
|
|
|
|
|