电气技术  2026, Vol. 27 Issue (6): 60-65    DOI:
技术与应用 |
厄瓜多尔科卡科多-辛克雷水电站1号机定子绕组局部放电问题分析
马文豪1, 吴建辉2, 王博功1, 付强1,3,4,5, 胡春秀1,3,4,5
1.哈尔滨电机厂有限责任公司,哈尔滨 150040;
2.北京华科同安监控技术有限公司,北京 100041;
3.哈尔滨大电机研究所有限公司,哈尔滨 150040;
4.水力发电设备全国重点实验室,哈尔滨 150040;
5.国家水利发电设备工程技术研究中心,哈尔滨 150040
Analysis on the partial discharge of the first generator stator winding in CoCa Codo Sinclair Hydropower Station in Ecuador
MA Wenhao1, WU Jianhui2, WANG Bogong1, FU Qiang1,3,4,5, HU Chunxiu1,3,4,5
1. Harbin Electric Machinery Company Limited, Harbin 150040;
2. Beijing Huake Tongan Company Limited, Beijing 100041;
3. Harbin Research Institute of Large Electrical Machinery Company Limited, Harbin 150040;
4. State Key Laboratory of Hydro-power Equipment, Harbin 150040;
5. National Engineering Research Center of Hydropower Equipment, Harbin 150040